January 19, 2018

Europe’s tallest modular tower in place at Wembley

Triangle were awarded the contract for the BS 9251 residential fire sprinkler system and BS 9990 wet riser at Apex House, Wembley. This follows similar successful installations for Tide Construction including Grand Felda House, Karma House and Sherwood Court. The … Read More

New High Rise Contract

We have recently been awarded the contract for the BS 9251 fire sprinkler system and BS 9990 wet rising main at Three Mills, a high quality purpose built student accommodation. The former Esso petrol station is set to become a … Read More

Triangle Awarded 3 Student Accommodation Projects!

            Triangle Fire Systems have been awarded the contract for the supply, design, and installation of a BS 9251 fire sprinkler system at 3 new student accommodation projects on behalf of McAleer & Rushe. Two of … Read More

Triangle Fire Systems On Site At Mayflower Halls

Triangle Fire Systems are now on site at Mayflower Halls in Southampton, to provide fire sprinkler protection to the student accommodation. The development consists of over 1,100 top quality student bedrooms across three blocks, ranging from 8-16 storeys and positioned … Read More