November 20, 2017

Triangle on site at London City Island

Triangle Fire Systems are currently installing a BS 9251 residential sprinkler system at Blocks A&M of London City Island. We have also recently secured the contract for Blocks B&C. Working on behalf of Cilantro Engineering UK Ltd we will be installing … Read More

New High Rise Contract

We have recently been awarded the contract for the BS 9251 fire sprinkler system and BS 9990 wet rising main at Three Mills, a high quality purpose built student accommodation. The former Esso petrol station is set to become a … Read More

Sprinkler Stop!

A Triangle Sprinkler System has once again successfully actuated and extinguished a fire.   The fire occurred in a bedroom at a 5 store specialised housing unit at 11:51 on Monday 24th October. 2 pumps were mobilised and on arrival … Read More

Triangle Secure Highpoint Contract

Triangle Fire Systems have secured the contract for the design, supply and installation of  a BS9251:2014 residential sprinkler system, an EN12845 commercial sprinkler system and the wet and dry rising mains at Highpoint, Newington Butts in Elephant and Castle. The … Read More